Objective:

The goal of this project was to reconnect an old, dried-out backwater to the weir, allowing controlled water flow and restoring the riverbank. This involved installing hinge trees to create varied water depths, relocating on-site trees to enhance the bank, and using hazel fascine revetments with hemp rope for stabilization.

 

Challenges:

The primary challenge was working on soft peat water meadows and within a Site of Special Scientific Interest (SSSI), which required careful access and minimal environmental impact.

 

Equipment and Methods:

A 5-ton excavator with bio-oil and a tilt rotator was used for efficient material movement on soft ground. A custom-built grab-and-drive post driver attachment allowed precise placement of posts.

 

Outcomes:

On a return visit, it appeared as if no one had been there, blending seamlessly into the natural environment. This was considered the main accomplishment.

Location

River Test Hampshire

Services 

Environmental Contracting 

Plant Hire 

Transport


 

155068c2-52c4-4783-82d4-738747ca96f0.jpg
IMG_4025_edited.jpg
IMG_3847.jpeg
95cd3400-d0d8-4f8d-8587-e0a825f1727d.jpg

About Mays Technical 
 

Environmental Contractor Plant hire Groundworks based in Hampshire UK 

Services 

bottom of page